In addition to running a day-to-day crane hire operation Vulcan Engineering have been specialising in the lifting and transportation of heavy, oversize modules and structures for the ship building and industrial sectors in the last 15 years.

In December 2000, Vulcan Engineering joined the “Big League” with the acquisition of a Cometto Hydraulic Platform Trailer capable of lifting and transporting loads up to 460 tonne in weight.

Vulcan Engineering has carried out hundreds of specialised lifting and transportation operations for our clients. Please find below details of some recent project work carried out.



You may require the Adobe Acrobat Reader to view some of the files below:


 

Client Image Marine
Project Transfer of Catamaran Majestic 2 from Image Marine on Egmont Road to Oceanfast Slipway
Client Reference Dave Mearns
Length 42m
Width 14m
Height 18m
Weight 140 Tonne


Client Wavemaster International
Project Transfer of 6 high speed ferries bound for Singapore from Wavemaster Henderson to the SBF Tammy Lift
Client Reference Dave Sackett
Length 35m Each
Width 9m
Height 14m
Weight 105 Tonne


Client Oceanfast Luxury Yachts
Project Transport & Installation of "Aussie Rules" components. Aussie Rules is the luxury yacht being constructed for Greg Norman
Client Reference John Estimov
Length 25m
Width 12m
Height 8m
Weight 120 Tonne


Client Austal Group of Companies
Project Relocation of Hulls 77 & 79. Work included repositioning of both hulls in the Oceanfast complex. Each vessel weighed 300 Tonne. 2 Cometto platform trailers were used for each move
Client Reference John Wray
Length 56.5m
Width 10m
Height 16m
Weight 300 Tonne


Client Clough Engineering
Project Transport of 8 digester sections for the SMRC Plant at Canningvale. 8 segments at 200 tonne each were tranported over a 5 day period
Client Reference Nigel Prettyman
Length 36m
Width 7m
Height 7m
Weight 200 Tonne


Client Van Der MEER Consulting
Project Transport of Slipway Wedge Trolley fabricated and assembled at Vulcans fabrication operation to site at Jervoise Bay. This work eliminated the requirement for on site labour and equipment for erection
Client Reference Jim Van Der MEER
Length 54m
Width 10m
Height 4m
Weight 60 Tonne


Client Transfield Macmahon Contractors Joint Venture
Project The frame was fabricated by Vulcan Engineering and transported site in one section to eliminate on site welding. The frame is used for pitching of 42m long 1000mm diam piles for the Australian Marine Complex Development
Client Reference Keith Briers, Sean Westoby
Length 20m
Width 12m
Height 8m
Weight 35 Tonne


 

 
  For more information, please contact us